High speed mill performance

S.N.

Customer

Description

Delivered in

1

Angang Steel

re-modeling of Finishing mill block

Aug, 1994

2

Shougang Steel

Re-modeling of finishing mill block

May 1994

3

Koyei Steel Vietnam Company

Top-cross 45°,84m/s(75 m/s) mill line, air cooling line with roller operating speed 0.1-1.4m/s

Oct, 1995

4

Chongqing Steel

Top-cross 45°,75m/s(80 m/s), roller operating speed 0.1-0.3 m/s

Jun, 1999

5

Tanggang Steel

Re-modeling of their No.2 high speed wire line

Dec, 1999

6

Wujin steel

Side-cross 45°,84m/s(75 m/s) finishing mill block, pinch roller, wire feeding mill

Jul, 1999

7

Shuicheng Steel

Side-cross 45°,84m/s(75 m/s) finishing mill block, pinch roller, wire feeding mill

Sep, 1999

8

Pingxiang Steel

Top cross 45°,120m/s(105 m/s)pre-finishing mill block

July, 2000

9

Fugang Steel

POMINI bar train

Oct, 2000

10

Xiangtan Steel

To-cross 45°,105m/s(90 m/s) pre-finishing mill,finishing mill, pinch roller, layer head( line A and Line B)

Sep, 2000

11

HBIS Handan Steel

Gear box assembly for hot shears mill

Dec, 2000

12

Xuanhua Steel

Top-cross 45°,105m/s(90 m/s)pre-finishing mill, finishing mill, pinch roller, layer head

April, 2001

13

Funshun New Steel

bending and collecting machine for 450mm CSP line

May, 2001

14

Shougang Steel Wire Company

Top-cross 45°17m/s pre-finishing mill, finishing mill

May, 2001

15

Xiangtan Steel

Top-cross 45°,105m/s(90 m/s)pre-finishing mill, finishing mill, pinch roller, layer head (Line C and Line D)

Sep, 2001

16

Jiugang Steel

Adjusting mechanism and roll replacement for pre-finishing mill

Oct, 2001

17

Qingdao Steel

Pre-finishing mill (finishing 120m/s)

Nov, 2001

18

Liugang Steel

Pre-finishing mill(finishing 120m/s)

April, 2002

19

Jigang Steel

Top-cross 45°,105m/s pre-finishing and finishing mill, pinch roller, layer head

April, 2002

20

Funshun New Steel

General Contractor for top 45°,105m/s(90 m/s)high speed wire mill

May, 2002

21

Pingxiang Steel

Top-cross 45°,105m/s(90 m/s) pre-finishing mill, finishing mill, pinch roller, layer head (double line)

Dec, 2003

22

Guotai Steel In Henan Luoyang

Top cross 45°,105m/s(90 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Dec, 2003

23

Beitai Steel

Tap-cross 45°,105m/s(90 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(double line)

April, 2004

24

Chengde Steel

Top cross 45°, 105m/s(90 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Sep, 2004

25

Hengda Steel in Guangdong Maoming

Top cross 45°,105m/s(90 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(double line )

Sep, 2004

26

Baogang Steel

1#、2#、3# sizing machine

Dec, 2004

27

No.1 Wire plant of Shougang Steel

Top cross 45°,105m/s(90 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Oct, 2005

28

Junlong Steel in Shaanxi province

Top cross 45°,105m/s(90 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Dec, 2005

29

Shuicheng Steel in Guizhou province

Top-cross 45°,120m/s(105 m/s)pre-finishing mill

Feb, 2006

30

Zhongyang Steel in Shanxi Province

Top cross 45°,105m/s(90 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

April, 2006

31

Rizhao Steel in Shandong

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(double line)

May, 2006

32

Wugang Steel - Yunnan Kungang branch

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jun, 2006

33

Xuanhua Steel in Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jul, 2006

34

Longhai Steel in Xingtai City, Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jul, 2006

35

Mingfang Steel, in Wuan City, Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Aug, 2006

36

Beitai Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head (double line)

Sep, 2006

37

Changping Steel, in Huguan City, Shanxi Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Oct, 2006

38

Rizhao Steel in Shandong Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head (line C and Line D)

Line C is delivered in Nov, 2006

Line D is delivered in Feb ,2007

39

Puyang Steel in Hebei province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jan, 2007

40

Xinjin Steel in Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Feb ,2007

41

Chuxiong Steel in Yunan Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Mar, 2007

42

Magang Steel in Hefei city,Anhui Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Mar, 2007

43

Yuhua Steel in Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

April, 2007

44

Tangyin Steel in Tangshan City, Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

May, 2007

45

Chengde Steel in Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

May, 2007

46

Meijin Steel in Shanxi Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Aug, 2007

47

Xuanhua Steel in Hebei Province

Top cross 45°,115m/s(95 m/s)finishing mill, pinch roller, layer head

Sep, 2007

48

Wanxin Steel in Guangxi Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Oct, 2007

49

Anfeng Steel in Qinhuangdao City, Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head (double line)

Dec, 2007 and Jan 2008.

50

Hengan Steel in Tangshan City, Hebei Province

Top cross 45°,115m/s(95 m/s)double high speed wire general contractor

Mar, 2008

51

Jiangxi Pinggang Steel Group Jiugang branch

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(double line)

April and May 2008

52

Indian Project

Top cross 45°,115m/s(95 m/s),finishing mill, pinch roller, layer head

Jun, 2008

53

Lengshuijiang Steel in Hunan province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Aug, 2008

54

Sanan Steel in Fujian Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Dec, 2008

55

Bayi Steel branch of Baosteel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jan, 2009

56

Dazhou Steel in Sichuan Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Feb, 2009

57

Yonglian Steel in Jiangsu Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Mar, 2009

58

Xiwang Group of Shandong Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

April, 2009

59

Sanjin Steel in Fuzhou city, Fujian province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

April, 2009

60

Zhongyang Steel in Shanxi province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

May ,2009

61

Liheng Steel in Shanxi Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

in May and June of 2009

62

Houying group in Liaoning Haicheng city

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jul, 2009

63

Tonghua Steel

Top cross 45°,115m/s(95 m/s),finishing mill, pinch roller, layer head

Aug, 2009

64

Jingye Steel in Shijiazhuang city, Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Sep, 2009

65

Aosen Steel in Xinji city, Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Oct, 2009

66

Mingshun Metallurgical Industry Limited in Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Nov, 2009

67

Guoyi Steel in Tangshan City, Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(double line)

Nov,2009

68

Xinpu Steel in Anyang city, Henan Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Dec, 2009

69

Guanfeng Metallurgical Industry Limited in Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jan, 2010

70

Anyuan Steel of Jiangxi Pinggang Group

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(double line)

Mar, 2010

71

Liyuang Steel in Liaoniang Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

April , 2010

72

Yongchang Steel, Yunnan Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

April, 2010

73

Longteng Steel, Jiangsu Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

May, 2010

74

Sanbao Steel, Fujian Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

May, 2010

75

Zhongyang Steel, Shanxi Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(double line)

Jun, 2010

76

Chunxing Steel in Tangshan City, Hebei Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Sep, 2010

77

Yili Steel in Xinjiang Province

Pre-finishing mill(finishing 120m/s)

Sep, 2010

78

Shenglong Steel in Guangxi Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Oct, 2010

79

Zhongxin Steel in Pengzhou City, Sichuang Province

Top cross 45°,95m/s(75 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jan, 2011

80

Shuicheng Steel, Guizhou Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Feb , 2011

81

Longmen Steel in Shaanxi Province

Top cross 45°,115m/s(95 m/s)finishing mill ( two sets)

Feb and Mar 2011

82

Zishan Jiufang Steel in Yongnian

Top cross 45°,95m/s(75 m/s)finishing mill, pinch roller, layer head

April, 2011

83

Tangyin Steel in Hebei Pronvince

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

May, 2011

84

Tangshan Zhengfeng Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(double line)

Jun, 2011

85

Sichuan Guanghan Xiangyang Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jun, 2011

86

Liaoyang Steel Rolling Company in Liangning province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jul, 2011

87

Wuan Xinjin Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jul, 2011

88

Lanzhou Lanxin Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Aug, 2011

89

Aosen Steel in Xinji city, hebei Province

Top cross 45°,95m/s(75 m/s),finishing mill, pinch roller, layer head

Aug, 2011

90

Jinzhou Steel in Tangshan Yutian City

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Sep, 2011

91

Yingkou Jiachen Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head( four lines)

Sep and Oct 2011

92

Yixin Steelin Luzhou City, Sichuang Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Oct, 2011

93

Shandong Huimin Minxin Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Oct, 2011

94

Fujian Wuhang Steel

Top cross 45°,115m/s(95 m/s)finishing mill, pinch roller, layer head

Nov, 2011

95

Yunnan Yukun Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Nov, 2011

96

Dezhou Jinguan Steel in Shandong Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Dec, 2011

97

HBIS Tanggang Stainless Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Dec, 2011

98

Shanxi Hongda Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Dec, 2011

99

Wuhu Xinxing Ductile Iron Pipes Co.,Ltd.

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jan, 2012

100

Changzhou Zhongtian Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jan, 2012

101

Tianjin Jinyide Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jan, 2012

102

Tangshan Qianan Jiujiang Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(four lines)

Jan and Feb 2012

103

Baotou Tengyi Steel

Top cross 45°,95m/s(75 m/s)finishing mill, pinch roller, layer head

Mar, 2012

104

Tangshan TianzhuSteel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(two lines)

Feb and Mar 2012

105

Fujian Xinhai Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Feb, 2012

106

Wuan Guangyao Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Mar 2012

107

Tiangang Steel No.3 Rolling Plant

Pre-finishing block(finishing 120m/s)

Mar 2012

108

Changzhou Zhongtian Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(two lines)

April, 2012

109

Tangshan Taifeng Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

May, 2012

110

Xinjiang Bayi Steel Project

Pre-finishing block(finishing 120m/s))

May, 2012

111

Shanxi Liheng Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head (two lines)

Jun, 2012

112

Suqian Zhongya Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jun, 2012

113

Tangshan Guye Guoyi Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head (two lines)

Jul, 2012

114

Jiangyin Changda Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jul, 2012

115

Xuangcheng Fenghuang Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Aug, 2012

116

Shanxi Hejin Huaxinyuan Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Aug, 2012

117

Magang Steel, No.2 Rolling Plant

Top cross 45°,115m/s(95 m/s)finishing block

Sep, 2012

118

Funshun New Steel (remodeling project)

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Sep, 2012

119

Dalian Yuandong Steel

Top Cross 45°,30 m/s finishing mill, pinch roller,layer head (rolling material is high speed steel)

Sep, 2012

120

Shandong Linxi Sande Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Oct, 2012

121

Wuxi Xinsanzhou Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Oct, 2012

122

Xinjiang Kunyu Steel

Pre-finishing block(four stands)

Oct, 2012

123

Quzhou Yuanli Steel

Pre-finishing block( finsihing 120m/s)

Oct, 2012

124

Xinjiang Daan Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(two lines)

Oct and Nov 2012

125

Shandong Yinan Hujing project

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Nov, 2012

126

Hebei Taigang Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Dec, 2012

127

Shougang Steel Changzhi branch

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head (two lines)

Dec, 2012

128

Lianyungang Yaxin Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(three lines)

Jan and Feb 2013

129

Wuan Yuhua Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(two lines)

Jan and Feb 2013

130

Shanxi Xingyuan Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Mar, 2013

131

Hebei Wuan Guangyao Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Mar, 2013

132

Shanxi Hejin Huaxinyuan Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

April 2013

133

Shandong Xinhua Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

April 2013

134

Wuan Jinding Heavy Machinery

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

May, 2013

135

Baotou Yaxin Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

May, 2013

136

Qinhuangdao North Metal Hose Co., Ltd

Top cross 45°,115m/s(95 m/s) finishing mill, pinch roller, layer head

Jun, 2013

137

Shanxi Zhongsheng Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jun, 2013

138

Shandong Luli

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jun 2013

139

Yunan Qujing Chenggang Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jul, 2013

140

Fujian Fuan Saiqi Project

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jul 2013

141

Shandong Zibo Steel

Top cross 45° high speed bar finishing block

Jul, 2013

142

Hebei Tangshan Jingan Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(two lines)

Aug, 2013

143

Yuxi Xianfu Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Aug, 2013

144

Guangxi Guigang Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Aug, 2013

145

Hefei Chenglong Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Sep, 2013

146

Guangxi Shenglong Project

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Sep, 2013

147

Tangshan Donghai iron and Steel Company

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Oct, 2013

148

Sandong Linyi Steel Group Sande Special Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Nov, 2013

149

Guangdong Longtengda Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Nov, 2013

150

Minquan Steel in Henan Puyang City

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Dec, 2013

151

Shandong Dongying Kaiya Metals Co.,Ltd.

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Dec, 2013

152

Wuan Yunfeng Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Dec, 2013

153

Tangshan Donghua Industrial Limited

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jan and Feb ,2014

154

Qinhuangdao North Metal Hose Co., Ltd

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Mar, 2014

155

Cangzhou SanlingSteel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

April 2014

156

Shandong Jingshun Special Steel Company

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jun, 2014

157

Xuzhou Huahong Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jun, 2014

158

Changfeng Steel in Dujiangyan City, Sichuan Province

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Aug ,2014

159

Shandong Xincheng Steel

Top cross 45°,115m/s(95 m/s)roughing and intermedite mill, pre-finishing mill,finishing mill, pinch roller, layer head

Sep, 2014

160

Mindong Saiqi Fuhua Steel Rolling Company

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Oct, 2014

161

Henan Yongcheng Minyuan Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Oct, 2014

162

Xuzhou Huahong Steel (the Line 2)

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Nov, 2014

163

Henan Anyang Yaxin Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Dec, 2014

164

Xinjiang Daan Steel

Pre-Finishing Stand(four stands)

Jan, 2015

165

Lijin City Hubei Zaoyang City

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Feb, 2015

166

Guangxi Hezhou Zhaoxin Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Mar, 2015

167

Dayin Huayin Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

April 2015

168

Lianyungang Yaxin Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(two lines)

April , 2015

169

Hubei jinshenglan Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(two lines)

Mar, 2015, and May 2015.

170

Vietnam Shengli Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

Jul, 2015

171

Changzhou Zhongtian Steel

Pre-finishing Mill (two lines)

In progress

172

Shandong Linxi Jiangquan Pipes

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

In progress

173

Zhengzhou Guangwu Special Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

In progress

174

Jigang Minyuan Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

In progress

175

Shandogn Xincheng Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head

In progress

176

Shouning Liansheng Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(two lines)

In progress

177

Jiangsu Qinyou Special Steel

Top cross 45°,115m/s(95 m/s)pre-finishing mill,finishing mill, pinch roller, layer head(two lines)

In progress